Engaged to complete the complete refubishment of the Link Bridge between the Cottrell Building and new Campus Central Building. Full modernisation including re-roofing and replacement of 125m of aluminium curtain walling each side of the bridge. New Linear LED Light system to the full length of the bridge internally, ceiling and flooring finishes throughout. Installation of new PV Panels on the roof which will feed electricity back to power the Link Bridge. Upgrade heating to efficient radiant panel system with trench heating down each side. Structural Repairs to the concrete forks and external cleaning throughout.
